Catamount Storage (28INR0097)
Catamount Storage is a 515.4 MW battery interconnection project in Harris, Texas with a current status of active. It is proposed to connect at Tap 345kV 46100 North Belt - 40850 Jordan CKT 99.
515.4 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Catamount Storage |
|---|---|
| Queue ID | 28INR0097 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 515.4 MW |
| State | Texas |
| County | Harris |
| Point of interconnection | Tap 345kV 46100 North Belt - 40850 Jordan CKT 99 |
| Requested (queue) date | 2024-09-04 |
| Proposed in-service date | 2028-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | TOCE TX BESS 4, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata