Cayuga sub (Jordan Creek Wind J515 POI) 345 kV (J2241)

Cayuga sub (Jordan Creek Wind J515 POI) 345 kV is a 320.0 MW wind interconnection project in Benton, Indiana with a current status of withdrawn. It is proposed to connect at Cayuga sub (Jordan Creek Wind J515 POI) 345 kV.

320.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameCayuga sub (Jordan Creek Wind J515 POI) 345 kV
Queue IDJ2241
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity320.0 MW
StateIndiana
CountyBenton
Point of interconnectionCayuga sub (Jordan Creek Wind J515 POI) 345 kV
Requested (queue) date2021-08-16
Proposed in-service date2024-04-01
Operational date2024-04-01
Withdrawn date2024-10-08
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.