Cedar 12kV is a 5.7 MW solar interconnection project in Ocean, New Jersey with a current status of withdrawn.

5.7 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCedar 12kV
Queue IDY3-101
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity5.7 MW
StateNew Jersey
CountyOcean
Point of interconnection
Requested (queue) date2013-04-29
Proposed in-service date2014-12-31
Operational date
Withdrawn date2013-09-30
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.