Cedar 230kV (X1-017)

Cedar 230kV is a 720.0 MW wind interconnection project in Atlantic, New Jersey with a current status of withdrawn.

720.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameCedar 230kV
Queue IDX1-017
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity720.0 MW
StateNew Jersey
CountyAtlantic
Point of interconnection—
Requested (queue) date2011-02-28
Proposed in-service date2016-09-30
Operational date—
Withdrawn date2012-02-07
Developer—
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.