Cedar Bayou 5 (TEF - Due Diligence) (23INR0029)

Cedar Bayou 5 (TEF - Due Diligence) is a 697.0 MW gas interconnection project in Chambers, Texas with a current status of operational. It is proposed to connect at 40000 Cedar Bayou 345kV.

697.0 MWCapacity
OperationalStatus
ChambersMarket
GasTechnology

Project facts

Canonical nameCedar Bayou 5 (TEF - Due Diligence)
Queue ID23INR0029
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketChambers
TechnologyGas
Capacity697.0 MW
StateTexas
CountyChambers
Point of interconnection40000 Cedar Bayou 345kV
Requested (queue) date2020-03-26
Proposed in-service date
Operational date2027-12-15
Withdrawn date
DeveloperNRG Energy, Inc.
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata