Cedar Creek 25kV (AC1-095)

Cedar Creek 25kV is a 9.9 MW solar interconnection project in New Castle, Delaware with a current status of withdrawn.

9.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCedar Creek 25kV
Queue IDAC1-095
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity9.9 MW
StateDelaware
CountyNew Castle
Point of interconnection
Requested (queue) date2016-10-19
Proposed in-service date2018-06-30
Operational date
Withdrawn date2020-03-09
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.