Cedar Draw BESS (27INR0193)

Cedar Draw BESS is a 225.7 MW other interconnection project in Scurry, Texas with a current status of operational. It is proposed to connect at 60011 Nebula7A 345kV .

225.7 MWCapacity
OperationalStatus
ScurryMarket
OtherTechnology

Project facts

Canonical nameCedar Draw BESS
Queue ID27INR0193
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketScurry
TechnologyOther
Capacity225.7 MW
StateTexas
CountyScurry
Point of interconnection60011 Nebula7A 345kV
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2027-12-31
Withdrawn date
DeveloperCedar Draw Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata