Scurry County, Texas — Interconnection Projects

The interXdata warehouse tracks 58 interconnection projects in Scurry, Texas, representing 11,458 MW of requested capacity.

58Total projects
6Active
38Operational
7Withdrawn
11,458 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar155,038 MW
Other152,480 MW
Wind101,998 MW
Battery121,787 MW
Gas6155 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Spectra Solar28INR0486Solar1,200.0 MWoperationalScurry, Texas
Zeus Scurry BESS27INR0535Other1,043.1 MWoperationalScurry, Texas
Zeus Scurry Solar27INR0529Solar503.5 MWoperationalScurry, Texas
Cedar Draw Solar27INR0192Solar451.4 MWoperationalScurry, Texas
Andromeda Solar22INR0412Solar326.6 MWoperationalScurry, Texas
Lumina Solar Project65645_LUMINSolar326.6 MWoperationalScurry, Texas
Jade Solar22INR0360Solar326.6 MWoperationalScurry, Texas
Lumina II Solar Project65644_LUMIISolar326.6 MWoperationalScurry, Texas
Jade Thunder Storage26INR0539Battery320.0 MWsuspendedScurry, Texas
Andromeda Storage II26INR0517Battery320.0 MWsuspendedScurry, Texas
Jade Flash Storage26INR0516Battery320.0 MWsuspendedScurry, Texas
Andromeda Storage IIB26INR0540Battery320.0 MWsuspendedScurry, Texas
Lumina Solar21INR0204Solar313.2 MWwithdrawnScurry, Texas
Canyon Wind Alternative23INR0526Wind311.6 MWsuspendedScurry, Texas
Canyon Wind18INR0030Wind308.8 MWactiveScurry, Texas
Canyon Wind Project, LLC60271_WT1Wind308.8 MWoperationalScurry, Texas
Inadale BESS25INR0197Other287.2 MWoperationalScurry, Texas
Inadale Solar25INR0196Solar281.0 MWoperationalScurry, Texas
Dermott Wind60902_DERMWind253.0 MWoperationalScurry, Texas
Coyote Wind17INR0027bOther242.6 MWoperationalScurry, Texas
Coyote Wind LLC63655_COYWind242.5 MWoperationalScurry, Texas
Cedar Draw BESS27INR0193Other225.7 MWoperationalScurry, Texas
Maldives Solar (Oncor POI)25INR0234Solar184.0 MWsuspendedScurry, Texas
Maldives Solar25INR0400Solar184.0 MWoperationalScurry, Texas
Brazos Wind Farm56111_GEN1Wind182.4 MWoperationalScurry, Texas
Flatland Solar19INR0129Solar182.2 MWwithdrawnScurry, Texas
Flatland Solar70183_FSPVSolar180.0 MWactiveScurry, Texas
Lumina Solar Project65645_LU1BABattery160.0 MWoperationalScurry, Texas
Lumina II Solar Project65644_LU2BABattery160.0 MWoperationalScurry, Texas
Fluvanna59245_FLUV1Wind155.4 MWoperationalScurry, Texas
HECATE GRID ROSALITA STORAGE FACILITY26INR0016Other152.8 MWwithdrawnScurry, Texas
Fluvanna Max Solar SLF29INR0077Solar152.7 MWoperationalScurry, Texas
Scurry County Wind LP56506_SCWWind130.5 MWoperationalScurry, Texas
Scurry County Wind II56775_1Wind120.0 MWoperationalScurry, Texas
Hide Town Energy Storage25INR0287Other102.8 MWoperationalScurry, Texas
Roost Energy Storage24INR0519Other102.4 MWoperationalScurry, Texas
Helion BESS27INR0624Other100.0 MWactiveScurry, Texas
Helion Solar27INR0623Solar100.0 MWactiveScurry, Texas
EG178 Facility56233_CTG1Gas60.5 MWoperationalScurry, Texas
EG178 Facility56233_CT02Gas60.5 MWoperationalScurry, Texas
Cross Trails Energy Storage Project69244_ESR1Battery58.3 MWoperationalScurry, Texas
Cross Trails Storage23INR0372Battery58.3 MWoperationalScurry, Texas
Endurance Park Storage 222INR0324Other52.2 MWwithdrawnScurry, Texas
Fluvanna Max BESS SLF28INR0202Other51.8 MWoperationalScurry, Texas
Endurance Park Storage21INR0479Other51.5 MWoperationalScurry, Texas
TX13 Endurance Park Storage65696_TX13Battery50.0 MWoperationalScurry, Texas
EG178 Facility56233_STGGas32.9 MWoperationalScurry, Texas
Brazos Wind Repower21INR0532Other22.4 MWoperationalScurry, Texas
Cross Trails Gravitational Storage22INR0592Other18.0 MWwithdrawnScurry, Texas
Snyder BESS20INR0258Other17.6 MWwithdrawnScurry, Texas
Snyder BESS69411_3005Battery10.0 MWoperationalScurry, Texas
Knapp BESS69226_KNBA1Battery10.0 MWactiveScurry, Texas
Knapp BESS25INR0747Other9.9 MWactiveScurry, Texas
WAL127264829_GEN3Gas0.4 MWoperationalScurry, Texas
WAL127264829_GEN1Gas0.4 MWoperationalScurry, Texas
WAL127264829_GEN2Gas0.4 MWoperationalScurry, Texas
Canyon BESS SLF26INR0473Battery0.0 MWsuspendedScurry, Texas
Snyder Wind Repower20INR0257Wind-15.0 MWwithdrawnScurry, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Scurry County.

Start tracking with interXdata