Cedarville-Ford 138 kV (AF1-045)

Cedarville-Ford 138 kV is a 52.2 MW battery interconnection project in Clermont, Ohio with a current status of suspended.

52.2 MWCapacity
SuspendedStatus
—Market
BatteryTechnology

Project facts

Canonical nameCedarville-Ford 138 kV
Queue IDAF1-045
Statussuspended
Source statusSuspended
Market—
TechnologyBattery
Capacity52.2 MW
StateOhio
CountyClermont
Point of interconnection—
Requested (queue) date2019-06-29
Proposed in-service date2025-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDEOK

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—suspendedhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata