Central-Chase City 115kV (AD2-063)

Central-Chase City 115kV is a 149.5 MW solar interconnection project in Charlotte, Virginia with a current status of withdrawn.

149.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCentral-Chase City 115kV
Queue IDAD2-063
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity149.5 MW
StateVirginia
CountyCharlotte
Point of interconnection
Requested (queue) date2018-02-26
Proposed in-service date2021-03-31
Operational date
Withdrawn date2023-05-24
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.