Cerulean Solar and Mulberry BESS (AG1-536)

Cerulean Solar and Mulberry BESS is a 75.0 MW battery interconnection project in Richmond, Virginia with a current status of active. It is proposed to connect at Garner-Northern Neck 115 kV.

75.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameCerulean Solar and Mulberry BESS
Queue IDAG1-536
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity75.0 MW
StateVirginia
CountyRichmond
Point of interconnectionGarner-Northern Neck 115 kV
Requested (queue) date2020-09-30
Proposed in-service date2031-05-31
Operational date
Withdrawn date
DeveloperVirginia Electric and Power Company
Utility / transmission ownerDominion

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.