Chesterfield 230 kV (AG2-646 - moved to TC2)

Chesterfield 230 kV is a 200.0 MW battery interconnection project in Chesterfield, Virginia with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameChesterfield 230 kV
Queue IDAG2-646 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateVirginia
CountyChesterfield
Point of interconnection
Requested (queue) date2021-03-31
Proposed in-service date2029-06-01
Operational date
Withdrawn date2025-11-25
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata