Chinquapin-Everetts 230 kV (AF2-080 - moved to TC1)

Chinquapin-Everetts 230 kV is a 70.0 MW solar interconnection project in Pitt, North Carolina with a current status of withdrawn.

70.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameChinquapin-Everetts 230 kV
Queue IDAF2-080 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity70.0 MW
StateNorth Carolina
CountyPitt
Point of interconnection
Requested (queue) date2020-01-31
Proposed in-service date2022-06-30
Operational date
Withdrawn date2026-01-15
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata