Chiquito Grid, LLC (65655_HECHQ)
Chiquito Grid, LLC is a 80.0 MW battery interconnection project in Riverside, California with a current status of active.
80.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology
Project facts
| Canonical name | Chiquito Grid, LLC |
|---|---|
| Queue ID | 65655_HECHQ |
| Status | active |
| Source status | (P) Planned for installation, but regulatory approvals not initiated |
| Market | CISO |
| Technology | Battery |
| Capacity | 80.0 MW |
| State | California |
| County | Riverside |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2027-03-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Chiquito Grid, LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata