Riverside County, California — Interconnection Projects
The interXdata warehouse tracks 2,612 interconnection projects in Riverside, California, representing 66,126 MW of requested capacity.
2,612Total projects
42Active
2,464Operational
106Withdrawn
66,126 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 71 | 18,150 MW |
| Solar | 2,390 | 15,796 MW |
| Solar+Battery | 37 | 11,896 MW |
| Gas | 55 | 11,676 MW |
| Other | 19 | 5,451 MW |
| Wind | 38 | 1,452 MW |
| Hydro | 1 | 1,300 MW |
| Solar+Wind+Battery | 1 | 405 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| EAGLE MOUNTAIN PUMP STORAGE #4 | 1193 | Battery | 1,408.0 MW | withdrawn | Riverside, California |
| ETERNAL 2 | 2050 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| EAGLE MOUNTAIN PUMP STORAGE #3 | 697 | Other | 1,400.0 MW | withdrawn | Riverside, California |
| EAGLE MOUNTAIN PUMP STORAGE #2 | 567 | Other | 1,400.0 MW | withdrawn | Riverside, California |
| IRON HILLS PUMPED STORAGE | 1525 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| ETERNAL PUMPED STORAGE | 1759 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| West Queue Project Q499 — Hydro in Riverside, California | Q499 | Hydro | 1,300.0 MW | withdrawn | Riverside, California |
| West Queue Project Q572 — Other in Riverside, California | Q572 | Other | 1,300.0 MW | active | Riverside, California |
| EAGLE MOUNTAIN PUMPED STORAGE PROJECT | 369 | Other | 1,300.0 MW | withdrawn | Riverside, California |
| VIEJO HYBRID POWER | 1088 | Gas | 910.0 MW | withdrawn | Riverside, California |
| PORTHOS SOLAR | 1523 | Solar+Battery | 900.0 MW | withdrawn | Riverside, California |
| CPV SENTINEL (FKA INTERGEN OCOTILLO) | 3 | Gas | 850.0 MW | operational | Riverside, California |
| INLAND EMPIRE ENERGY CENTER | 50 | Gas | 810.0 MW | operational | Riverside, California |
| PALO VERDE MESA (FKA BRIGHTSOURCE MIDPOINT SOLAR) | 643AC | Gas | 750.0 MW | withdrawn | Riverside, California |
| DESERT QUARTZSITE PV | 270 | Solar | 700.0 MW | withdrawn | Riverside, California |
| BLYTHE III | 167 | Gas | 700.0 MW | withdrawn | Riverside, California |
| MENIFEE POWER BANK | 1645 | Battery | 680.0 MW | operational | Riverside, California |
| MESAVILLE SOLAR | 1406 | Solar+Battery | 675.0 MW | withdrawn | Riverside, California |
| EASLEY | 2042 | Solar+Battery | 650.0 MW | active | Riverside, California |
| BLYTHE III (REVISED) | 225 | Gas | 640.0 MW | withdrawn | Riverside, California |
| IRISH | 1194 | Gas | 600.0 MW | withdrawn | Riverside, California |
| BLYTHE ENERGY PROJECT PHASE I | 11A | Gas | 520.0 MW | operational | Riverside, California |
| SONORAN 2 | 17 | Solar | 520.0 MW | withdrawn | Riverside, California |
| BLYTHE MESA SOLAR II - C5 | 881 | Solar | 500.0 MW | withdrawn | Riverside, California |
| BLYTHE SOLEIL | 439 | Gas | 500.0 MW | withdrawn | Riverside, California |
| GRISEDALE STORAGE 1 | 1762 | Battery | 500.0 MW | withdrawn | Riverside, California |
| OBERON | 1642 | Solar+Battery | 500.0 MW | active | Riverside, California |
| MESA SOLAR | 730 | Solar | 500.0 MW | withdrawn | Riverside, California |
| SOLO | 1637 | Solar+Battery | 500.0 MW | withdrawn | Riverside, California |
| BLUEWATER RENEWABLE ENERGY STORAGE | 72 | Battery | 500.0 MW | active | Riverside, California |
| DESERT SUNLIGHT PV III | 210 | Solar | 500.0 MW | withdrawn | Riverside, California |
| Grace Energy Center | 69820_GRA1 | Solar | 500.0 MW | active | Riverside, California |
| GRACE ENERGY CENTER | 1761 | Solar+Battery | 500.0 MW | active | Riverside, California |
| DOUBLE BUTTE STORAGE | 1646 | Battery | 500.0 MW | active | Riverside, California |
| Grace Energy Center | 69820_GRA2 | Battery | 500.0 MW | active | Riverside, California |
| GILA SOLAR | 643AF | Solar | 500.0 MW | withdrawn | Riverside, California |
| SUNNYNOOK SOLAR CENTER | 1640 | Solar+Battery | 500.0 MW | withdrawn | Riverside, California |
| GENESIS MCCOY | 193 | Gas | 500.0 MW | operational | Riverside, California |
| BLYTHE MESA SOLAR II | 874 | Solar | 500.0 MW | withdrawn | Riverside, California |
| DRACKER SOLAR | 294 | Solar+Battery | 485.0 MW | operational | Riverside, California |
| ALMASOL | 365 | Solar+Battery | 457.0 MW | operational | Riverside, California |
| ATHOS POWER PLANT | 1405 | Solar+Battery | 450.0 MW | active | Riverside, California |
| Calypso Solar 2 | 2256 | Solar | 407.3 MW | withdrawn | Riverside, California |
| MATTERHORN | 2366 | Solar+Wind+Battery | 404.9 MW | active | Riverside, California |
| Lycan Solar Project | 66805_LYCAN | Solar | 400.0 MW | active | Riverside, California |
| Lycan Solar Project | 66805_LYCN2 | Battery | 400.0 MW | active | Riverside, California |
| SALVADOR | 2051 | Solar+Battery | 400.0 MW | withdrawn | Riverside, California |
| LYCAN SOLAR | 1643 | Solar+Battery | 400.0 MW | active | Riverside, California |
| MAGNOLIA | 2112 | Battery | 400.0 MW | withdrawn | Riverside, California |
| CALYPSO SOLAR | 1636 | Solar+Battery | 400.0 MW | active | Riverside, California |
| MARVEL | 1295 | Battery | 400.0 MW | operational | Riverside, California |
| ARLINGTON | 1196 | Solar+Battery | 400.0 MW | operational | Riverside, California |
| ARDILLA | 2049 | Battery | 400.0 MW | withdrawn | Riverside, California |
| PALO VERDE ENERGY STORAGE | 1197 | Battery | 400.0 MW | withdrawn | Riverside, California |
| PELAGIC ENERGY STORAGE | 2035 | Battery | 400.0 MW | withdrawn | Riverside, California |
| Bajada | 2305 | Solar | 353.0 MW | active | Riverside, California |
| CRIMSON | 1192 | Battery | 350.0 MW | operational | Riverside, California |
| Easley Solar | 68758_IPEA2 | Battery | 350.0 MW | operational | Riverside, California |
| Desert Peak Energy Storage I | 65987_DP1 | Battery | 325.0 MW | operational | Riverside, California |
| ASHANTI HYBRID SOLAR | 2046 | Solar+Battery | 320.0 MW | withdrawn | Riverside, California |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| SunPower | 747 | 2 MW |
| Solar City | 143 | 1 MW |
| Real Goods | 111 | 1 MW |
| MOHR POWER SOLAR | 92 | 0 MW |
| Heliopower | 90 | 1 MW |
| SUNWIZE TECHNOLOGIES | 75 | 1 MW |
| PowerLight Corporation | 74 | 1 MW |
| Generic Installer | 70 | 1 MW |
| GALKOS | 59 | 0 MW |
| SolarCity | 58 | 0 MW |
| VERENGO | 51 | 0 MW |
| REVCO SOLAR | 31 | 0 MW |
| STOUT & BERG | 26 | 0 MW |
| Electricare, Inc. | 23 | 0 MW |
| Akeena Solar | 18 | 0 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ca-dgstats; California ISO — public interconnection queue; U.S. EIA — Form EIA-860M generator inventory (operating + planned); iid-queue; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Riverside County.
Start tracking with interXdata