Chokecherry and Sierra Madre Wind Energy Project (caiso_c15_426)

Chokecherry and Sierra Madre Wind Energy Project is a 3,290.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at TWE Project Wyoming Terminal 345kV.

3,290.0 MWCapacity
WithdrawnStatus
CAISOMarket
WindTechnology

Project facts

Canonical nameChokecherry and Sierra Madre Wind Energy Project
Queue IDcaiso_c15_426
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologyWind
Capacity3,290.0 MW
StateCalifornia
County
Point of interconnectionTWE Project Wyoming Terminal 345kV
Requested (queue) date2023-04-17
Proposed in-service date2027-12-01
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerCAISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.