CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV (J2027)

CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV is a 150.0 MW solar interconnection project in Dakota, Minnesota with a current status of operational. It is proposed to connect at CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV
Queue IDJ2027
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity150.0 MW
StateMinnesota
CountyDakota
Point of interconnectionCHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV
Requested (queue) date2025-07-14
Proposed in-service date2024-10-31
Operational date2024-10-31
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata