Churchmans (V4-003)

Churchmans is a 14.0 MW battery interconnection project in New Castle, Delaware with a current status of withdrawn.

14.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameChurchmans
Queue IDV4-003
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity14.0 MW
StateDelaware
CountyNew Castle
Point of interconnection—
Requested (queue) date2009-11-09
Proposed in-service date2010-03-31
Operational date—
Withdrawn date2010-05-17
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata