Churchtown 230kV (AA1-108)

Churchtown 230kV is a 158.0 MW gas interconnection project in Salem, New Jersey with a current status of withdrawn.

158.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameChurchtown 230kV
Queue IDAA1-108
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity158.0 MW
StateNew Jersey
CountySalem
Point of interconnection
Requested (queue) date2014-10-30
Proposed in-service date2021-12-01
Operational date
Withdrawn date2019-02-07
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata