Sunflower Electric Power Corp — Interconnection Queue Projects
Sunflower Electric Power Corp is associated with 24 tracked interconnection projects representing 1,128 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 21 | 757 MW |
| Other | 2 | 351 MW |
| Solar | 1 | 20 MW |
Geographic footprint
| State | Projects |
|---|---|
| Kansas | 24 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Holcomb | 108_1 | Other | 348.7 MW | operational | Finney, Kansas |
| Fort Dodge | 1233_4 | Gas | 149.0 MW | operational | Ford, Kansas |
| Garden City | 1336_S2 | Gas | 97.9 MW | operational | Finney, Kansas |
| Clifton | 8037_1 | Gas | 85.0 MW | operational | Washington, Kansas |
| Great Bend - Sunflower | 1235_3 | Gas | 81.6 MW | operational | Barton, Kansas |
| Garden City | 1336_S4 | Gas | 71.2 MW | operational | Finney, Kansas |
| Garden City | 1336_S5 | Gas | 71.2 MW | operational | Finney, Kansas |
| Cimarron River | 1230_1 | Gas | 50.0 MW | operational | Seward, Kansas |
| Russell | 67320_1 | Solar | 20.4 MW | operational | Russell, Kansas |
| Garden City | 1336_S3 | Gas | 16.0 MW | operational | Finney, Kansas |
| Cimarron River | 1230_2 | Gas | 15.0 MW | operational | Seward, Kansas |
| Rubart | 58255_10 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_12 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_03 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_11 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_06 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_09 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_02 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_07 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_01 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_04 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_05 | Gas | 10.0 MW | operational | Grant, Kansas |
| Rubart | 58255_08 | Gas | 10.0 MW | operational | Grant, Kansas |
| Clifton | 8037_2 | Other | 2.5 MW | operational | Washington, Kansas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Sunflower Electric Power Corp.
Start tracking with interXdata