Citrus City BESS (24INR0591)
Citrus City BESS is a 9.9 MW battery interconnection project in Hidalgo, Texas with a current status of operational. It is proposed to connect at Citrus City Substation_x000D_ Transformer # 2_x000D_ Station Code - CITRUSCY_x000D_ Load Name - LD02_x000D_ PTI Bus Number - 80123_x000D_ Transmission Voltage - 138_x000D_ .
Project facts
| Canonical name | Citrus City BESS |
|---|---|
| Queue ID | 24INR0591 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Hidalgo |
| Point of interconnection | Citrus City Substation_x000D_ Transformer # 2_x000D_ Station Code - CITRUSCY_x000D_ Load Name - LD02_x000D_ PTI Bus Number - 80123_x000D_ Transmission Voltage - 138_x000D_ |
| Requested (queue) date | 2023-06-30 |
| Proposed in-service date | 2025-07-29 |
| Operational date | 2025-07-16 |
| Withdrawn date | — |
| Developer | SBESS TX10 LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata