Citrus City BESS (24INR0591)

Citrus City BESS is a 9.9 MW battery interconnection project in Hidalgo, Texas with a current status of operational. It is proposed to connect at Citrus City Substation_x000D_ Transformer # 2_x000D_ Station Code - CITRUSCY_x000D_ Load Name - LD02_x000D_ PTI Bus Number - 80123_x000D_ Transmission Voltage - 138_x000D_ .

9.9 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameCitrus City BESS
Queue ID24INR0591
Statusoperational
Source statusoperational
MarketERCOT
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyHidalgo
Point of interconnectionCitrus City Substation_x000D_ Transformer # 2_x000D_ Station Code - CITRUSCY_x000D_ Load Name - LD02_x000D_ PTI Bus Number - 80123_x000D_ Transmission Voltage - 138_x000D_
Requested (queue) date2023-06-30
Proposed in-service date2025-07-29
Operational date2025-07-16
Withdrawn date
DeveloperSBESS TX10 LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata