Citrus Flatts BESS (24INR0294)

Citrus Flatts BESS is a 103.0 MW other interconnection project in Cameron, Texas with a current status of operational. It is proposed to connect at 80022 Oleander 138kV.

103.0 MWCapacity
OperationalStatus
CameronMarket
OtherTechnology

Project facts

Canonical nameCitrus Flatts BESS
Queue ID24INR0294
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCameron
TechnologyOther
Capacity103.0 MW
StateTexas
CountyCameron
Point of interconnection80022 Oleander 138kV
Requested (queue) date2022-03-30
Proposed in-service date
Operational date2026-05-16
Withdrawn date
DeveloperCitrus Flatts Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata