Citrus Flatts Energy Center, LLC (69352_CFBA1)

Citrus Flatts Energy Center, LLC is a 100.0 MW battery interconnection project in Cameron, Texas with a current status of operational.

100.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameCitrus Flatts Energy Center, LLC
Queue ID69352_CFBA1
Statusoperational
Source status(OA) Out of service but expected to return to service in next calendar year
MarketERCO
TechnologyBattery
Capacity100.0 MW
StateTexas
CountyCameron
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-07-01
Withdrawn date
Developer
Utility / transmission ownerEast Point Energy, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata