Clairemont Solar 1 (27INR0435)

Clairemont Solar 1 is a 251.8 MW solar interconnection project in Kent, Texas with a current status of operational. It is proposed to connect at 59908 Novaprime 345kV.

251.8 MWCapacity
OperationalStatus
KentMarket
SolarTechnology

Project facts

Canonical nameClairemont Solar 1
Queue ID27INR0435
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketKent
TechnologySolar
Capacity251.8 MW
StateTexas
CountyKent
Point of interconnection59908 Novaprime 345kV
Requested (queue) date2025-01-28
Proposed in-service date—
Operational date2029-02-13
Withdrawn date—
DeveloperClairemont Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30phaseSS Completed, FIS Started, IASS Completed, FIS Completed, IAlow
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.