Kent County, Texas — Interconnection Projects

The interXdata warehouse tracks 10 interconnection projects in Kent, Texas, representing 2,534 MW of requested capacity.

10Total projects
1Active
8Operational
0Withdrawn
2,534 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar81,969 MW
Wind1305 MW
Other1259 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Clairemont Solar68351_CLAPVSolar500.0 MWactiveKent, Texas
Lake Henry Wind24INR0398Wind305.0 MWsuspendedKent, Texas
Jay Flat BESS27INR0447Other259.4 MWoperationalKent, Texas
Texas Solar Nova19INR0001Solar253.5 MWoperationalKent, Texas
Texas Solar Nova 165654_TSN1Solar252.0 MWoperationalKent, Texas
Clairemont Solar 127INR0435Solar251.8 MWoperationalKent, Texas
Texas Solar Nova 220INR0269Solar201.1 MWoperationalKent, Texas
TEXAS SOLAR NOVA 322INR0215Solar200.2 MWoperationalKent, Texas
Texas Solar Nova 265660_TSN2Solar200.0 MWoperationalKent, Texas
Carpet Tech Solar One28INR0301Solar110.7 MWoperationalKent, Texas

Top developers

Developer (canonical)ProjectsCapacity
TEXAS SOLAR NOVA 1, LLC3655 MW
Jay Flat BESS LLC1259 MW
Clairemont Solar LLC1252 MW
CT Solar One1111 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Kent County.

Start tracking with interXdata