Clarion Solar (24INR0025)

Clarion Solar is a 180.0 MW solar interconnection project in Medina, Texas with a current status of withdrawn. It is proposed to connect at 5290 Lytle 138kV.

180.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameClarion Solar
Queue ID24INR0025
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity180.0 MW
StateTexas
CountyMedina
Point of interconnection5290 Lytle 138kV
Requested (queue) date2021-02-28
Proposed in-service date2024-08-01
Operational date
Withdrawn date2024-04-30
DeveloperibV Energy Partners LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata