Clark County - Thistle 345 kV line break (GEN-2022-190)

Clark County - Thistle 345 kV line break is a 200.0 MW wind interconnection project in Kiowa, Kansas with a current status of withdrawn. It is proposed to connect at Clark County - Thistle 345 kV line break.

200.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameClark County - Thistle 345 kV line break
Queue IDGEN-2022-190
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity200.0 MW
StateKansas
CountyKiowa
Point of interconnectionClark County - Thistle 345 kV line break
Requested (queue) date2023-02-28
Proposed in-service date2027-12-15
Operational date
Withdrawn date2023-05-31
Developer
Utility / transmission ownerITCGP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.