Clayton 12 kV (AE2-088)

Clayton 12 kV is a 2.5 MW solar interconnection project in Gloucester, New Jersey with a current status of withdrawn.

2.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameClayton 12 kV
Queue IDAE2-088
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity2.5 MW
StateNew Jersey
CountyGloucester
Point of interconnection
Requested (queue) date2019-02-22
Proposed in-service date2020-03-02
Operational date
Withdrawn date2019-08-22
Developer
Utility / transmission ownerAEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.