Cleary Flood Hybrid (1682_BS1)

Cleary Flood Hybrid is a 3.0 MW battery interconnection project in Bristol, Massachusetts with a current status of operational.

3.0 MWCapacity
OperationalStatus
ISNEMarket
BatteryTechnology

Project facts

Canonical nameCleary Flood Hybrid
Queue ID1682_BS1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyBattery
Capacity3.0 MW
StateMassachusetts
CountyBristol
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2020-03-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Taunton - (MA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata