Cleary Flood Hybrid (1682_CA9)

Cleary Flood Hybrid is a 95.0 MW gas interconnection project in Bristol, Massachusetts with a current status of operational.

95.0 MWCapacity
OperationalStatus
ISNEMarket
GasTechnology

Project facts

Canonical nameCleary Flood Hybrid
Queue ID1682_CA9
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyGas
Capacity95.0 MW
StateMassachusetts
CountyBristol
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1975-12-01
Withdrawn date
Developer
Utility / transmission ownerCity of Taunton - (MA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata