Cleary Flood Hybrid is a 95.0 MW gas interconnection project in Bristol, Massachusetts with a current status of operational.

95.0 MWCapacity
OperationalStatus
ISNEMarket
GasTechnology

Project facts

Canonical nameCleary Flood Hybrid
Queue ID1682_CA9
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyGas
Capacity95.0 MW
StateMassachusetts
CountyBristol
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1975-12-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Taunton - (MA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.