CO Queue Project BHCT-G44 — Solar+Battery in Otero, Colorado

CO Queue Project BHCT-G44 — Solar+Battery in Otero, Colorado is a 50.0 MW solar+battery interconnection project in Otero, Colorado with a current status of withdrawn. It is proposed to connect at South Fowler 115 kV Substation.

50.0 MWCapacity
WithdrawnStatus
COMarket
Solar+BatteryTechnology

Project facts

Canonical nameCO Queue Project BHCT-G44 — Solar+Battery in Otero, Colorado
Queue IDBHCT-G44
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologySolar+Battery
Capacity50.0 MW
StateColorado
CountyOtero
Point of interconnectionSouth Fowler 115 kV Substation
Requested (queue) date2023-06-26
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBlack Hills Colorado Electric

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: blackhills-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata