Otero County, Colorado — Interconnection Projects
The interXdata warehouse tracks 10 interconnection projects in Otero, Colorado, representing 256 MW of requested capacity.
10Total projects
1Active
6Operational
3Withdrawn
256 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 156 MW |
| Solar+Battery | 2 | 90 MW |
| Other | 5 | 10 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| CO Queue Project BHCT-G43 — Solar in Otero, Colorado | BHCT-G43 | Solar | 150.0 MW | withdrawn | Otero, Colorado |
| CO Queue Project BHCT-G44 — Solar+Battery in Otero, Colorado | BHCT-G44 | Solar+Battery | 50.0 MW | withdrawn | Otero, Colorado |
| CO Queue Project BHCT-G39 — Solar+Battery in Otero, Colorado | BHCT-G39 | Solar+Battery | 40.0 MW | withdrawn | Otero, Colorado |
| La Junta Solar | 70116_GEN1 | Solar | 4.8 MW | active | Otero, Colorado |
| Rocky Ford | 6516_IC4 | Other | 2.0 MW | operational | Otero, Colorado |
| Rocky Ford | 6516_IC1A | Other | 2.0 MW | operational | Otero, Colorado |
| Rocky Ford | 6516_IC5 | Other | 2.0 MW | operational | Otero, Colorado |
| Rocky Ford | 6516_IC3 | Other | 2.0 MW | operational | Otero, Colorado |
| Rocky Ford | 6516_IC2 | Other | 2.0 MW | operational | Otero, Colorado |
| BH CSG 3 | 68941_BHC3 | Solar | 1.5 MW | operational | Otero, Colorado |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: blackhills-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Otero County.
Start tracking with interXdata