CO Queue Project GI-2021-25 — Wind in Morgan County, Colorado
CO Queue Project GI-2021-25 — Wind in Morgan County, Colorado is a 362.0 MW wind interconnection project in Morgan County, Colorado with a current status of withdrawn. It is proposed to connect at Pawnee Substation 345 kV.
362.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology
Project facts
| Canonical name | CO Queue Project GI-2021-25 — Wind in Morgan County, Colorado |
|---|---|
| Queue ID | GI-2021-25 |
| Status | withdrawn |
| Source status | Withdrawn 08/30/2022 |
| Market | CO |
| Technology | Wind |
| Capacity | 362.0 MW |
| State | Colorado |
| County | Morgan County |
| Point of interconnection | Pawnee Substation 345 kV |
| Requested (queue) date | 2021-10-06 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | 2022-08-30 |
| Developer | — |
| Utility / transmission owner | Public Service Company Of Colorado |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: psco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata