CO Queue Project GI-CS-2025-06 — Battery in Rio Blanco, Colorado

CO Queue Project GI-CS-2025-06 — Battery in Rio Blanco, Colorado is a 150.0 MW battery interconnection project in Rio Blanco, Colorado with a current status of withdrawn. It is proposed to connect at Meeker 138kV Substation.

150.0 MWCapacity
WithdrawnStatus
COMarket
BatteryTechnology

Project facts

Canonical nameCO Queue Project GI-CS-2025-06 — Battery in Rio Blanco, Colorado
Queue IDGI-CS-2025-06
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologyBattery
Capacity150.0 MW
StateColorado
CountyRio Blanco
Point of interconnectionMeeker 138kV Substation
Requested (queue) date2025-09-18
Proposed in-service date2029-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata