Rio Blanco County, Colorado — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Rio Blanco, Colorado, representing 156 MW of requested capacity.
3Total projects
0Active
2Operational
1Withdrawn
156 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 1 | 150 MW |
| Solar | 1 | 4 MW |
| Other | 1 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| CO Queue Project GI-CS-2025-06 — Battery in Rio Blanco, Colorado | GI-CS-2025-06 | Battery | 150.0 MW | withdrawn | Rio Blanco, Colorado |
| Bar D | 61886_GEN1 | Solar | 4.0 MW | operational | Rio Blanco, Colorado |
| Taylor Draw Hydroelectric Facility | 54729_COX1 | Other | 2.3 MW | operational | Rio Blanco, Colorado |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Rio Blanco County.
Start tracking with interXdata