Rio Blanco County, Colorado — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Rio Blanco, Colorado, representing 156 MW of requested capacity.

3Total projects
0Active
2Operational
1Withdrawn
156 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery1150 MW
Solar14 MW
Other12 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
CO Queue Project GI-CS-2025-06 — Battery in Rio Blanco, ColoradoGI-CS-2025-06Battery150.0 MWwithdrawnRio Blanco, Colorado
Bar D61886_GEN1Solar4.0 MWoperationalRio Blanco, Colorado
Taylor Draw Hydroelectric Facility54729_COX1Other2.3 MWoperationalRio Blanco, Colorado

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Rio Blanco County.

Start tracking with interXdata