Colonial Trail - Surry 230 kV (AH1-324 - moved to TC2)

Colonial Trail - Surry 230 kV is a 80.0 MW solar interconnection project in Surry, Virginia with a current status of withdrawn.

80.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameColonial Trail - Surry 230 kV
Queue IDAH1-324 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity80.0 MW
StateVirginia
CountySurry
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2030-12-31
Operational date
Withdrawn date2025-12-03
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata