Columbus East 345 (GEN-2013-040)

Columbus East 345 is a 200.0 MW wind interconnection project in Butler, Nebraska with a current status of withdrawn. It is proposed to connect at Columbus East 345.

200.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameColumbus East 345
Queue IDGEN-2013-040
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity200.0 MW
StateNebraska
CountyButler
Point of interconnectionColumbus East 345
Requested (queue) date2013-12-20
Proposed in-service date
Operational date
Withdrawn date2014-02-11
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata