Combined Cycle GT is a 68.0 MW gas interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at Located at current Cleary node 375,376 interconnected with National Grid s-8 and v-5 line, SEMA load zone..

68.0 MWCapacity
WithdrawnStatus
SEMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle GT
Queue ID608
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGas
Capacity68.0 MW
StateMassachusetts
CountyBristol
Point of interconnectionLocated at current Cleary node 375,376 interconnected with National Grid s-8 and v-5 line, SEMA load zone.
Requested (queue) date2016-04-22
Proposed in-service date2020-05-01
Operational date
Withdrawn date2016-05-24
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata