Combined Cycle (211)

Combined Cycle is a 496.0 MW gas interconnection project in Bristol, Massachusetts with a current status of withdrawn. It is proposed to connect at NSTAR 115 kV line #111.

496.0 MWCapacity
WithdrawnStatus
SEMAMarket
GasTechnology

Project facts

Canonical nameCombined Cycle
Queue ID211
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGas
Capacity496.0 MW
StateMassachusetts
CountyBristol
Point of interconnectionNSTAR 115 kV line #111
Requested (queue) date2007-05-08
Proposed in-service date2010-06-01
Operational date
Withdrawn date2007-11-20
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.