COMMERCE ENERGY STORAGE 2 (1766)

COMMERCE ENERGY STORAGE 2 is a 250.0 MW battery interconnection project in Los Angeles, California with a current status of active. It is proposed to connect at Laguna Bell Substation 230kV.

250.0 MWCapacity
ActiveStatus
MetroMarket
BatteryTechnology

Project facts

Canonical nameCOMMERCE ENERGY STORAGE 2
Queue ID1766
Statusactive
Source statusACTIVE
MarketMetro
TechnologyBattery
Capacity250.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionLaguna Bell Substation 230kV
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata