Commodore-Jordan (J2306)

Commodore-Jordan is a 150.0 MW solar interconnection project in Perry, Illinois with a current status of withdrawn. It is proposed to connect at Commodore-Jordan.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCommodore-Jordan
Queue IDJ2306
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateIllinois
CountyPerry
Point of interconnectionCommodore-Jordan
Requested (queue) date2021-07-21
Proposed in-service date2024-11-01
Operational date2024-11-01
Withdrawn date2021-12-08
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata