Commodus Solar (29INR0030)

Commodus Solar is a 502.1 MW solar interconnection project in Briscoe, Texas with a current status of operational. It is proposed to connect at Tap 345kV 23914 Tule Canyon - 23900 Alibates.

502.1 MWCapacity
OperationalStatus
BriscoeMarket
SolarTechnology

Project facts

Canonical nameCommodus Solar
Queue ID29INR0030
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBriscoe
TechnologySolar
Capacity502.1 MW
StateTexas
CountyBriscoe
Point of interconnectionTap 345kV 23914 Tule Canyon - 23900 Alibates
Requested (queue) date2024-07-22
Proposed in-service date
Operational date2029-07-30
Withdrawn date
DeveloperIP Blackwell II, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata