Briscoe County, Texas — Interconnection Projects

The interXdata warehouse tracks 10 interconnection projects in Briscoe, Texas, representing 3,114 MW of requested capacity.

10Total projects
0Active
6Operational
4Withdrawn
3,114 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar31,112 MW
Other21,052 MW
Wind5950 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Commodus Wind29INR0031Other641.4 MWoperationalBriscoe, Texas
Commodus Solar29INR0030Solar502.1 MWoperationalBriscoe, Texas
BRP Snowdon BESS23INR0330Other410.9 MWoperationalBriscoe, Texas
Silverton Solar28INR0023Solar410.0 MWoperationalBriscoe, Texas
Silver Canyon Wind A12INR0002aWind200.0 MWwithdrawnBriscoe, Texas
Tecovas 1 W16INR0117Wind200.0 MWwithdrawnBriscoe, Texas
Longhorn Wind58772_GEN1Wind200.0 MWoperationalBriscoe, Texas
Swisher 230kV SubstationGEN-2022-043Solar200.0 MWwithdrawnBriscoe, Texas
Tecovas 2 W17INR0033Wind200.0 MWwithdrawnBriscoe, Texas
Briscoe Wind Farm59734_BFWWind150.0 MWoperationalBriscoe, Texas

Top developers

Developer (canonical)ProjectsCapacity
IP Blackwell II, LLC21,144 MW
ENGIE IR Holdings LLC2400 MW
EDP Renewables North America LLC1200 MW
Nextera1410 MW
BRP SNOWDON BESS LLC1411 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Briscoe County.