Complex Serenity Wind (28INR0215)

Complex Serenity Wind is a 971.0 MW other interconnection project in Armstrong, Texas with a current status of operational. It is proposed to connect at Double tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and Tule Canyon (bus# 23914) to Midpoint Switch (bus# 23931).

971.0 MWCapacity
OperationalStatus
ArmstrongMarket
OtherTechnology

Project facts

Canonical nameComplex Serenity Wind
Queue ID28INR0215
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketArmstrong
TechnologyOther
Capacity971.0 MW
StateTexas
CountyArmstrong
Point of interconnectionDouble tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and Tule Canyon (bus# 23914) to Midpoint Switch (bus# 23931)
Requested (queue) date2025-06-05
Proposed in-service date
Operational date2029-04-16
Withdrawn date
DeveloperSerenity Wind, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata