Armstrong County, Texas — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Armstrong, Texas, representing 4,292 MW of requested capacity.

9Total projects
1Active
7Operational
0Withdrawn
4,292 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other42,746 MW
Wind41,042 MW
Solar1504 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Zeus Armstrong BESS25INR0587Other1,043.1 MWoperationalArmstrong, Texas
Complex Serenity Wind28INR0215Other971.0 MWoperationalArmstrong, Texas
Zeus Armstrong Solar25INR0586Solar503.6 MWoperationalArmstrong, Texas
Serenity Wind27INR0443Other473.0 MWoperationalArmstrong, Texas
Goodnight59246_GOOD1Wind265.5 MWoperationalArmstrong, Texas
Goodnight Wind II69403_GOOD2Wind265.5 MWactiveArmstrong, Texas
Goodnight Wind II23INR0637Other259.2 MWoperationalArmstrong, Texas
Goodnight Wind14INR0033Wind258.1 MWoperationalArmstrong, Texas
Armstrong Wind18INR0029Wind253.0 MWsuspendedArmstrong, Texas

Top developers

Developer (canonical)ProjectsCapacity
FGE Goodnight II, LLC2517 MW
Serenity Wind, LLC21,444 MW
Armstrong BESS, LLC11,043 MW
Armstrong Solar, LLC1504 MW
Big Sky Energy1253 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Armstrong County.

Start tracking with interXdata