Cooper 345kV (GEN-2012-017)

Cooper 345kV is a 115.0 MW other interconnection project in Brownville, Nebraska with a current status of withdrawn. It is proposed to connect at Cooper 345kV.

115.0 MWCapacity
WithdrawnStatus
NEMarket
OtherTechnology

Project facts

Canonical nameCooper 345kV
Queue IDGEN-2012-017
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyOther
Capacity115.0 MW
StateNebraska
CountyBrownville
Point of interconnectionCooper 345kV
Requested (queue) date2012-09-20
Proposed in-service date
Operational date
Withdrawn date2013-08-20
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata