COPPER MOUNTAIN PROJECT (56)

COPPER MOUNTAIN PROJECT is a 634.0 MW gas interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at El Dorado 230 kV Substation.

634.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameCOPPER MOUNTAIN PROJECT
Queue ID56
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity634.0 MW
StateNevada
CountyClark
Point of interconnectionEl Dorado 230 kV Substation
Requested (queue) date2005-01-25
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata