Corazon Solar (15INR0044)

Corazon Solar is a 202.6 MW solar interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at 80219 Lobo 345kV.

202.6 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameCorazon Solar
Queue ID15INR0044
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity202.6 MW
StateTexas
CountyWebb
Point of interconnection80219 Lobo 345kV
Requested (queue) date2013-09-05
Proposed in-service date2021-10-22
Operational date2021-10-11
Withdrawn date
DeveloperCorazon Energy, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata