Corbin Grid BESS (23INR0069)

Corbin Grid BESS is a 202.8 MW other interconnection project in Fort Bend, Texas with a current status of withdrawn. It is proposed to connect at 44510 Obrien 138kV.

202.8 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameCorbin Grid BESS
Queue ID23INR0069
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity202.8 MW
StateTexas
CountyFort Bend
Point of interconnection44510 Obrien 138kV
Requested (queue) date2020-08-03
Proposed in-service date2026-06-01
Operational date
Withdrawn date2023-09-11
DeveloperCorbin Grid, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.