Corralitos Wind 1 (24INR0505)

Corralitos Wind 1 is a 196.1 MW other interconnection project in Zapata, Texas with a current status of operational. It is proposed to connect at Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation).

196.1 MWCapacity
OperationalStatus
ZapataMarket
OtherTechnology

Project facts

Canonical nameCorralitos Wind 1
Queue ID24INR0505
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketZapata
TechnologyOther
Capacity196.1 MW
StateTexas
CountyZapata
Point of interconnectionTap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)
Requested (queue) date2023-01-30
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperVaquero Wind Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.